VERMONT SSN 792: Difference between revisions
mNo edit summary |
mNo edit summary |
||
(8 intermediate revisions by the same user not shown) | |||
Line 22: | Line 22: | ||
<td valign="top"> | <td valign="top"> | ||
<ol>Virginia Class (Block IV) Nuclear Powered Attack Submarine<br/> | <ol>Virginia Class (Block IV) Nuclear Powered Attack Submarine<br/> | ||
Construction Began May 2014 | Construction Began May 2014<br/>Naming Ceremony by SecNav Ray Mabus 18 September 2014<br/> | ||
Keel Laid & Christened 20 October 2018 - Launched | Keel Laid & Christened 20 October 2018 - Launched 29 March 2019<br/><br/> | ||
<li>'''USS VERMONT SSN-792'''<br/> | <li>'''USS VERMONT SSN-792'''</li>Administratively Commissioned 18 April 2020<br/>Public Commissioning Ceremony 28 August 2021 | ||
</ol></td> | </ol></td> | ||
<td align="center" width="220" valign="top"> | <td align="center" width="220" valign="top"> | ||
Line 44: | Line 44: | ||
range for covers on that page. | range for covers on that page. | ||
<ol> | <ol> | ||
<li>[[VERMONT_SSN_792_Covers_Page_1 | USS Vermont SSN-792 Covers Page 1]] (2018- | <li>[[VERMONT_SSN_792_Covers_Page_1 | USS Vermont SSN-792 Covers Page 1]] (2018-2021)</li> | ||
</ol> | </ol> | ||
<p> </p> | <p> </p> | ||
Line 80: | Line 80: | ||
<h4>1st Commissioning</h4> | <h4>1st Commissioning</h4> | ||
--> | --> | ||
<br/><h4>USPS Pictorial Postmarks</h4> | |||
<!-- ============== --> | <!-- ============== --> | ||
<!-- POSTMARK ENTRY --> | <!-- POSTMARK ENTRY --> | ||
Line 85: | Line 86: | ||
<br/> <br/><table width="95%" border="1" cellpadding="5" cellspacing="0"> | <br/> <br/><table width="95%" border="1" cellpadding="5" cellspacing="0"> | ||
<tr><td align="center" valign="center" width="140"> | <tr><td align="center" valign="center" width="140"> | ||
USPS<br/> | USPS<br/>Pictorial Postmark<br/><br/>"Commissioning Sta."<br/><br/>Groton CT | ||
</td><td align="center" valign="center" width="100"> | </td><td align="center" valign="center" width="100"> | ||
2020-04-18 | |||
</td><td align="center" width="350"> | </td><td align="center" width="350"> | ||
[[Image: | [[Image:GregCiesielski_Vermont_SSN792_20200418_1_Postmark.jpg|thumb|center|300px]] | ||
</td><td align="center" width="100"> | </td><td align="center" width="100"> | ||
N/A | N/A | ||
</td></tr></table> | </td></tr></table> | ||
Postmark designed by [[Cachet_Maker_Wolfgang_Hechler_ | Wolfgang Hechler]] for the Commissioning but it was never submitted for approval and use. | |||
<!-- === End of Postmark Entry === --> | |||
<!-- ============== --> | |||
<!-- POSTMARK ENTRY --> | |||
<!-- ============== --> | |||
<br/> <br/><table width="95%" border="1" cellpadding="5" cellspacing="0"> | |||
<tr><td align="center" valign="center" width="140"> | |||
USPS<br/>Pictorial Postmark<br/><br/>"Commissioning Station"<br/><br/>Montpelier VT | |||
</td><td align="center" valign="center" width="100"> | |||
2020-04-18 | |||
</td><td align="center" width="350"> | |||
[[Image:GregCiesielski_Vermont_SSN792_20200418_3_Postmark.jpg|thumb|center|300px]] | |||
</td><td align="center" width="100"> | |||
[[Image:GregCiesielski_Vermont_SSN792_20200418_3_Front.jpg|thumb|center|100px]] | |||
</td></tr></table> | |||
Commissioning, cachet by [[Cachet_Maker_Michael_Brock_ | Michael Brock]] | |||
<!-- === End of Postmark Entry === --> | <!-- === End of Postmark Entry === --> | ||
<p> </p> | <p> </p> | ||
<h3>Other Information</h3> | <h3>Other Information</h3> |
Latest revision as of 17:39, 27 September 2021
Ship Name and Designation History
This section lists the names and designations that the ship had during its lifetime. The list is in chronological order.
Construction Began May 2014 Naming Ceremony by SecNav Ray Mabus 18 September 2014 Keel Laid & Christened 20 October 2018 - Launched 29 March 2019 Public Commissioning Ceremony 28 August 2021 |
This section lists active links to the pages displaying covers associated with the ship. There should be a separate set of pages for each name of the ship (for example, Bushnell AG-32 / Sumner AGS-5 are different names for the same ship so there should be one set of pages for Bushnell and one set for Sumner). Covers should be presented in chronological order (or as best as can be determined).
Since a ship may have many covers, they may be split among many pages so it doesn't take forever for the pages to load. Each page link should be accompanied by a date range for covers on that page.
- USS Vermont SSN-792 Covers Page 1 (2018-2021)
Postmarks
This section lists examples of the postmarks used by the ship. There should be a separate set of postmarks for each name and/or commissioning period. Within each set, the postmarks should be listed in order of their classification type. If more than one postmark has the same classification, then they should be further sorted by date of earliest known usage.
A postmark should not be included unless accompanied by a close-up image and/or an
image of a cover showing that postmark. Date ranges MUST be based ONLY ON COVERS IN
THE MUSEUM and are expected to change as more covers are added.
>>> If you have a better example for any of the postmarks, please feel free to replace the
existing example.
Postmark Type |
Postmark Date |
Thumbnail Link To Postmark Image |
Thumbnail Link To Cover Image |
---|
USPS Pictorial Postmarks
USPS |
2020-04-18 |
N/A |
Postmark designed by Wolfgang Hechler for the Commissioning but it was never submitted for approval and use.
USPS |
2020-04-18 |
Commissioning, cachet by Michael Brock
Other Information
NAMESAKE - Named for the State of Vermont.
Three ships of the United States Navy have borne the name VERMONT - USS Vermont (Receiving Ship, 1862), USS Vermont BB-20 and USS Vermont SSN-792.
The ships sponsor is Ms. Gloria Valdez, former Deputy Assistant Secretary of the Navy (Ships).
If you have images or information to add to this page, then either contact the Curator or edit this page yourself and add it. See Editing Ship Pages for detailed information on editing this page.
Copyright 2024 Naval Cover Museum